Welcome to Durcan Services
Welcome to Durcan Services

Service / Maintenance

All buildings which have a Wet or Dry Riser must comply with the standards BS5306 and BS9990/2015. A visual inspection is recommended every 6 months and a hydraulic pressure test every 12 months. Failure to do so may invalidate your insurance. We work throughout Lincolnshire and across the UK. Contact us today for expert Wet and Dry Riser serrvicing and maintenance.

 

Our maintenance company has service agreements in place covering numerous prestigious sites across the nation including numerous care homes, residential dwellings and commercial buildings. We work for both end users and sub-contractors for other Fire Protection Companies and Facilities Management Companies alike. Our reputation for a cost effective, concise and professional service is reflected in the growth of our service base month after month. We pride ourselves on continuity of custom and all our staff are directly employed and not commission based like many of our competitors. Hence, all our customers find we offer a professional service and an honest appraisal in the eventuality we find any faults.

 

 

 

6 Month Visual Insppction Consists Of  Checking The Following - 

  • All valve open and close, leave close (checking strap and lock if required)
  • All outlet washers
  • For damaged and missing blank caps and chains
  • That all hand wheels and nuts are undamaged and intact
  • Landing outlet valves open freely and are undamaged
  • The inlet cabinet and do for corrosion
  • The inlet breaching valve springs and rubbers are free moving and in good condition
  • The inlet/outlet cabinet glass
  • All required sinage is present and correct

 

Annual Pressure Testing

Dry Risers - An annual pressure test entails connectinf the inlet to a pump and water supply. The system is then completely charged with water to a pressure of 12 bar, measured at inlet for a period of at least 15 minutes. During this perpd an inspection is made to ensure that there is no leakage of water at any of the joints or landing valves. Once the pressure test is completed the system must be drained so that it is left ready for immediate use. In the event of the system failing due to inability to hold pressure for the reccommended 12 minutes at 12 bar, a restart will be required.

Wet Risers - For Wet Riser Sytems there are additional checks, on cleanliness of storage tanks, booster pumps wnd associated mechanidal and electrical equipment.

 

Riser Maintenance & Remedial Repairs -

  • Replacing outlet washers#
  • Repair or replace valves (replace lock and strap if necessary)
  • Replace blank caps and chains
  • Repair or replace hand wheel nuts
  • Repair or replace landing outlets
  • Replace the inlet cabinet and door
  • Repair the inlet breeching valve/s springs (replace rubbers as necessary)
  • Replace inlet/outlet cabinet glass
  • Supply dry riser sinage to all floors if required

 

For more information on how we can help install, repair or maintain your equipment, call us today on 0800 77 20206. We offer a free, no obligation assessment and quotation.

Our Location

6 Casswell Drive

Spalding

PE11 4QW

Areas We Work In

Contact Us

Social Media

Print Print | Sitemap
© Durcan Services Limited 2017